Skip to main content

Animal shelter, Gmajnice

The project documentation prepared by IDZ, PGD, PZI and PID dealt with the removal of existing facilities and the construction of a new shelter complex, which includes 6 new facilities - a reception and veterinary clinic, a dog shelter, a cat shelter, an administrative building, a warehouse and a service facility. In addition to the above-listed facilities, an external system of treatment plant pools, a fire water pool and an ecological island are also being implemented within the service facility. The facilities are physically separated from each other and therefore equipped with their own entrances. The reception and veterinary clinic is connected to both shelters via steel canopies.